翻訳と辞書
Words near each other
・ Köln-Düsseldorfer Kriminalkomitee
・ Köln-Ehrenfeld station
・ Köln-Frankfurter Straße station
・ Köln-Holweide station
・ Köln-Longerich station
・ Köln-Lövenich station
・ Köln-Mülheim station
・ Köln-Müngersdorf Technologiepark station
・ Köln-Nippes station
・ Köln-Stammheim station
・ Köln-Steinstraße station
・ Köln-Trimbornstraße station
・ Köln-Volkhovener Weg station
・ Köln-Weiden West station
・ Köln-Worringen station
Kölnbrein Dam
・ Kölner Akademie
・ Kölner Haie
・ Kölner Herbst-Stuten-Meile
・ Kölner Stadt-Anzeiger
・ Kölner Werkschulen
・ Kölner Zeitschrift für Soziologie und Sozialpsychologie
・ Kölnischer Kunstverein
・ KölnLiteraturPreis
・ Kölntriangle
・ Köln–Frankfurt high-speed rail line
・ Kölpinsee
・ Kölsch
・ Kölsch (artist)
・ Kölsch (beer)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Kölnbrein Dam : ウィキペディア英語版
Kölnbrein Dam

The Kölnbrein Dam is an arch dam in the Hohe Tauern range within Carinthia, Austria. It was constructed between 1971 and 1979 and at high, it is the tallest dam in Austria.〔 The dam's reservoir serves as the primary storage in a three-stage pumped-storage power system that consists of nine dams, four hydroelectric power plants and a series of pipeline and penstocks. The complex is owned by Verbund power company and is referred to as the Malta-Reisseck Power Plant Group. The installed capacity of the group is 1,028.5 MW and its annual generation is .
While the dam's reservoir was filling, several cracks appeared in the dam and it took more than a decade of repairs before the reservoir could operate at maximum levels.〔(【引用サイトリンク】url=http://www.verbund.com/cc/en/news-media/power-plants/pumped-storage-plants )〕〔(【引用サイトリンク】url=http://www.atcold.at/index.php?option=com_sobi2&sobi2Task=sobi2Details&sobi2Id=160&Itemid=9 )〕〔(【引用サイトリンク】url=http://www.verbund.com/cc/en/news-media/vistor-centres )〕 Currently, the Reisseck II pumped-storage power plant is under construction and will effectively connect both the Malta and Reisseck groups and add an additional 430 MW of production capacity.
==Construction==

Plans for the dam were already drafted in the late 1930s by the German AEG engineering company, when the Kaprun power plant was built north of the Alpine divide. The project was resumed by the Austrian authorities after World War II with extended exploratory drilling from 1957 onwards, nevertheless the construction of the Kölnbrein Dam did not begin until 1971.
Before cement and other construction materials could be moved on site, an access road had to be constructed. This proved difficult as the steep Malta Valley rises over along a stretch and at times has 13 percent gradients. To complete the road, six tunnels were excavated. In 1973, as superstructure construction progressed, cement was transported on site and mixed with aggregate from local sources. To reduce thermal expansion, concrete was poured at a time and pipes with circulating water were placed throughout the mass. The structure consisted of 30 columns with each joint grouted. Construction conditions high in the valley were not ideal as workers coped with snow and rain along with wind speeds of .